Trinity College Dublin announces DCA Instruments to provide bespoke Multi-MBE/Sputter Deposition System

DCA Instruments won the competitive contract for the new Multi-MBE/Sputter deposition system at Trinity College Dublin (Ireland).

This versatile and complex system is to include two R450 Sputter chambers, a pulsed laser deposition chamber (PLD 500), an R450 MBE reactor, and a Cluster Tool Robot for automated substrate transfer.

System installation is expected in Spring 2018.

 

Hybrid-MBE system installation at Penn State University

DCA has installed a new Hybrid MBE system at Penn State University this May. The system design facilitates the deposition of metal organic molecules and thus combines low energetic deposition techniques in a unique way, dubbed “Hybrid MBE”.
Read more